تنفيذ محطات رفع 1 و 2 بشرق بورسعيد

عن المشروع :

اسم المشروع : تنفيذ محطات رفع 1 و 2 بشرق بورسعيد
تفاصيل المشروع : Construction of pump station 1 & 2 with capacity of 54000 m3/day & 14000 m3/day in East Port Said Industrial zone.

وصف المشروع :

'- Construction of under ground deep (dry & wet) well, substation, rmu room, valves room, flow meter room, steel hangers, fences with heritage finishes, main gates including all MEP Works, pumps, header lines, suction lines, riser lines, gate – plug - & non return valves, medium voltage cables, low voltage cables, control cables, EMDP, LV panels & soft starters, transformers, generators, cranes, screens, water hammer tanks, automatic foam system, fuel tanks fire alarm & etc.
- Execute finish works such as block works, painting, epoxy works, stainless steel handrails, ceramic tiles, grp decorations works, suspended ceiling steel doors, aluminum windows, steel gates & etc.
- Infrastructure & geotechnical works including soil improvement with reinforced geogrid layers, geotextile layer, structural fill, stone piles, interlocking roads & sidewalk, street lighting, water, sewerage & fire fighting networks.