Mahsama 1 lift station & Abou Sultan Prestressed Concrete pipe line

About The Project

Project Name : The Construction of Mahsama 1 lift station & Abou Sultan Prestressed Concrete (1200mm Dia.) Pipe lines ( 6.5 kilometer), Ismailia, Egypt
Project Details : The Construction of Mahsama 1 lift station & Abou Sultan Prestressed Concrete (1200mm Dia.) Pipe lines ( 6.5 kilometer), Ismailia, Egypt

Project Description :

This project involves the construction of the Mahsama 1 Lift Station and the installation of prestressed concrete pipelines (1200mm diameter) over a 6.5-kilometer stretch in Ismailia, Egypt. The Mahsama 1 lift station is designed to enhance wastewater pumping capacity, ensuring efficient flow management. The installation of the prestressed concrete pipelines provides a durable and reliable solution for wastewater transportation, offering resistance to internal pressures and external loads. The project aims to improve the region’s sanitation infrastructure, ensuring long-term performance and minimizing maintenance. The construction adheres to local engineering standards and environmental regulations.

Implementing of Irrigation 1200 mm prestressed concrete pipe (6.
5 Km) in Ismailia governate including choosing required cranes, excavation methods, fill methods, including gate valves rooms, air valves rooms & clean valves rooms.